A significant portion of the Science building is currently without air conditioning, and will be for the next few weeks. Upon investigating reports of high room temperatures from occupants in the building last week, Facilities Management confirmed that the building’s chiller has failed and needs to be replaced immediately.
A replacement has been located; however, the equipment has to be shipped in and installation may take four to six weeks. Every effort is being made to complete the replacement as quickly as possible.
Updates on the status of the replacement will be provided on the Facilities Management website as information is available.